Our telecom projects

  •    Project Management of  MCI phase 3 development includes 1823 mobile BTS sites and 38 BSC sites as an EPC in 23 provinces of Iran including: TSS, SA, Site Design, Civil Work, Radio Planning, TI Installation, Integration, Optimization, QAC & FAC.
  • Tehran Province network development project.
  • Phase 5 swap project and phase 6 development of the MCI (Route 3).
  • Carrying out the TurnKey new site of Irancell in Tehran and Alborz from the SA to launch and optimize the site in the cluster.
  • Installation of Western Azar sites Phase 7 of MCI Project.
  • Performing the antenna swap and installing RRU 4G project of the phase 7PL of MCI Western Azar.
  • Performing new site project and installing mobile site equipment in Ilam province.
  • Performing the New site project from SA to installing complete equipment for Rightel sites in Khorasan Province.
  • Swap of Irancell sites from 2G to 3G including Link, RBS and antenna and installation the 3G equipment of Nokia systems to Ericsson in Tehran province.
  • Installation and commissioning of 70 radio links in Fars province of Phase 3 of MCI project.
  • Preparing plans, executive plans, asbuilt and site folder 600 sites of Mazandaran, Gilan and Khouzestan provinces.